In anticipation of moving aboard Cheers in the spring of 2023 we sold our 3000 sf home and moved into a 1300 sf apartment.
Tuesday, March 1, 2022
Saturday, January 1, 2022
Winter Projects 2022
We hauled out on 11/1 for heated winter storage at Son Rise Marina in Sandusky Ohio.
The first project was installing new carpet in the salon and cabins. The first step was making templates for the 4 areas we wanted to carpet.
- Simrad NSS EVO3 MFD's x2
- Simrad NAC3 Autopilot
- Simrad AP48 Controller
- Simrad WR10 Wireless Remote
- Simrad Halo+ Radar
- Simrad NAIS 500
- Simrad IS42 Remote Display
- Airmar DST800 Multi Sensor
- Fusion RA770 Stereo
Thursday, September 30, 2021
Fall Work 2021
In preparation for winter storage our goal is to paint the below deck areas and replace the engine room floor boards. The original bilge paint is chipping away in some areas and requires a lot of prep work.
We completed the lazarette prior to haul out. The engine room and forward rooms will have to wait.
Tuesday, July 6, 2021
July 4th at Cedar Point
We spent the holiday weekend back at our home dock at Cedar Point Marina. The wind had shifted to NNE and the temperature and humidity dropped. The 4th started with a dinghy parade and ended with fireworks on the beach.
Thursday, July 1, 2021
Lake Erie Islands
Our first trip of the year took us to Kelly's Island and Put-in-Bay.
Next stop was Put-in-Bay. We stayed on a mooring buoy for the night and took the water taxi in for dinner, drinks and live music. The next morning we decided to head back to Cedar Point due to the wind forecast.
Monday, May 31, 2021
Shake Down Spring 2021
We returned to Cedar Point Marina on May 1st, 2021. The first shake down cruise went well with all systems working as they should except the bow thruster. The thruster is a 24 volt KP12 from Key Power and had worked great last fall. I had the thruster apart over the winter and replaced all seals and gaskets.
The month a May was devoted to troubleshooting and attempts to repair the thruster. After replacing the motor cleaning/testing the relay box and having the batteries checked a call was made to Dean at Key Power. The voltage was dropping below 20 volts under load he recommended replacing the batteries. The 4 year old 8D AGM's were replaced and the thruster is back up to full power. Thanks Dean!
It's good to be home with a full summer ahead of us. Cedar Point opens mid May and Covid restrictions are being dropped in Ohio.
Monday, April 26, 2021
Winter Work 2021
The anchor pulpit was re-cored.
The heat exchangers were boiled out. All belts, hoses and clamps were replaced.
Final Summary Over 12k miles
We purchased Cheers in June 2020 in Stuart Florida and brought her to Lake Erie via the Erie Canal after a brief layover in Baltimore due t...
-
After 2 years of full time travel, completing the Great Loop with two trips to the Bahamas and Canada, we have decided to start our next adv...
-
We purchased Cheers in June 2020 in Stuart Florida and brought her to Lake Erie via the Erie Canal after a brief layover in Baltimore due t...
-
Woke up this morning to a light rain. We made the first west bound opening of lock E2 at 7:30 am and was the only boat in the lock. There...
















































